aluminum-gangway-manufacture-BoardSafe-DocksAfter a massive nor-easter shredded up New England in March 2018, many homes, businesses and other structures needed to be replaced. Included in the devestation was a 80-foot gangway which was ripped apart. The City of Quincy had to replace almost all of its floating docks. One of those replaced included a 5-foot wide by 80-foot gangway. It was an emergency repair. After BoardSafe received the order it was able to complete the project in 2 weeks.

aluminum-gangway-manufacturer-BoardSafe-Dock

aluminum-gangway-manufacturer-BoardSafe-Docks

Contact Board Safe

Full Name(*)
Please type your full name.

E-mail(*)
Invalid email address.

Phone(*)
Invalid Input

Interested In(*)
Please tell us how big is your company.

AntiSpam(*)
AntiSpam
Invalid Input