• [email protected]
  • 610.899.0286
  • Location: Plant A, 604 Crisscross Road, Fleetwood, PA 19522
BoardSafe Docks
BoardSafe Docks
  • About
  • Products
    • Pedestrian Bridges
    • Gangways
    • Rowing Docks
    • Floating Docks
    • Accessible Kayak Launch
    • Combination Dock Systems
    • Adaptive Fishing Piers
  • Projects
  • Videos
  • Resources
    • Articles
    • BoardSafe Newsletters
    • Frequently Asked Questions
    • Links and Downloads
    • Site Evaluation Questionnaire
    • Find a Launch Near You
  • Consult
  • Contact
    • Sales & General Inquiry
    • Work With Us
  • Request Quote
    • About
    • Products
      • Pedestrian Bridges
      • Gangways
      • Rowing Docks
      • Floating Docks
      • Accessible Kayak Launch
      • Combination Dock Systems
      • Adaptive Fishing Piers
    • Projects
    • Videos
    • Resources
      • Articles
      • BoardSafe Newsletters
      • Frequently Asked Questions
      • Links and Downloads
      • Site Evaluation Questionnaire
      • Find a Launch Near You
    • Consult
    • Contact
      • Sales & General Inquiry
      • Work With Us
    • Request Quote

Portfolios

Temple U. Unveils State-of-the-Art Rowing Center

Project Location: Schuylkill River, Philadelphia, PA
Project Contact: Brian Perkins, Temple University Men’s Head Rowing Coach
484.863.4635 / [email protected]
Project Description: The East Park Canoe House is an historical property located just north of Boathouse Row along the Schuylkill River in Philadelphia, PA. The location is the new home of Temple University’s Women’s and Men’s Rowing Teams.

BoardSafe Docks provided the design, engineering (structural and foundation), manufacturing, and installation. The city of Philadelphia mandated that the entire dock system could not be attached to the historic stonewall located along the banks of the Schuylkill River. To provide the necessary structure for the system, BoardSafe Docks designed two large foundations independent from the wall. Cantilevered decks were attached to the foundations, and oversized gangways then acted as the structural component between the decks and floating docks.

• main dock: 10 feet by 280 feet
• two foundation systems
• two cantilevered decks (structural supports for floating dock system)
• two 24-foot-by-40-foot gangways

Services and products supplied by BoardSafe Docks

• Structural Engineering
o dock system
o foundation systems for cantilevered decks
o deck / gangway (designed to hold the entire floating dock system in place)
o structural steel support system for cantilevered deck

• Design
o floating docks
o gangways
o cantilevered decks

• Components Manufactured and Installed
o BoardSafe 50 Series low-profile floating docks
o BoardSafe HD Series gangways
o cantilevered decks
o rebar foundation cages

Temple University Rowing Center
  • Previous Complete Dock System for The Foundry, Cleveland, OH
  • Next PA Barge Club Receives Boathouse Dock System
  • Office: 123 S. Richmond St., Fleetwood, PA 19522
    Plant A: 604 Crisscross Road, Fleetwood, PA 19522
  • [email protected]
  • 610.899.0286

Work With Us

If you would like to work with us, please go to our
Work With Us contact page.

Office Hours

  • Mon – Fri: 9:00 – 5:00
  • Saturday: By Appointment
  • Sunday: Closed

© All Rights Reserved | MADE IN THE USA | Privacy Policy