07
Mar
In early March of 2022. the following project was installed at the Mariners’ Museum in Newport News, VA. The client had a fixed pier with steps that lead to a floating dock. The floating dock was removed and a new pressure-treated ramp was installed by the customer on top of the pier, which then provided ADA-compliant egress to the dock. We then added an 8-foot-by-5-foot gangway, 8’ x 16’ floating dock, and Clip-a-Launch 16D (without an adaptive boarding kit). The cost of this project was approximately $27,000.00 (manufacturing only).