Aluminum Gangway at Renewed Quincy, MA, Ferry Terminal
BoardSafe contracted to build and install a 100’ aluminum gangway for the Quincy, MA, public ferry terminal. “Quincy needs a consistent and reliable ferry service year-round to get us to Boston to make a living,” says Carolyn Krantz, who commutes to Boston from Quincy. BoardSafe is proud to be a part of this initiative.

The pier at Squantum Point has existed since the 1980s, when it was built to accommodate workers and equipment needing transit to Deer Island. Quincy’s plan is to employ two vessels that could each ferry up to 120 passengers on weekdays and weekends. BoardSafe's aluminum gangway will make access to the ferry convenient and reliable for years to come.

BoardSafe Gangway Will Connect People with Floating Dock in Scituate, MA
Located 20 miles southwest of Boston, the historic town of Scituate on Cape Cod Bay is one of the most picturesque harbors in New England. Scituate Harbor Marina has one of the most convenient locations in Scituate Harbor. They are the closest public marina in the harbor to ocean access. They are the only marina that can accommodate vessels up to 80 feet LOA. They have ample vehicle parking with secure access to our docks.

BoardSafe designed, built, and installed a 5' x 80’ gangway for the marina. This gangway connects the land with a floating dock.

[metaslider id="6912"]





