In July 2022, BoardSafe Docks installed a project for the Tennessee Wildlife Resources Agency at Pickwick Dam in Tennessee. The floating dock system consisted of 10’ x 200’ main dock three (3) 5’ x 30’ gangways three (3) 6’ x 10’ connecting docks at bottom of gangway composite…
BoardSafe Docks was contracted to come up with a design for a new floating dock system on the Schuylkill River across from Pottstown, PA, in North Coventry Township. The site included an existing boat ramp and signs of a previous dock system that was washed away in a…