Pickwick Tennessee

BoardSafe Floating Dock System at Pickwick Dam in Tennessee

In July 2022, BoardSafe Docks installed a project for the Tennessee Wildlife Resources Agency at Pickwick Dam in Tennessee.

The floating dock system consisted of

  • 10’ x 200’ main dock
  • three (3) 5’ x 30’ gangways
  • three (3) 6’ x 10’ connecting docks at bottom of gangway
  • composite decking
  • 20-inch freeboard

Not only will Pickwick be a great floating fishing pier for locals, it is also a prime location for professional bass tournaments, such as the Bass Master Elite Series scheduled for the fall of 2022.

BoardSafe Docks is a premier manufacturer of floating docks, aluminum gangways, pedestrian bridges, rowing docks and centers, adaptive kayak launches, and similar water access applications. BoardSafe custom manufactures products for all locations and engineers products for site-specific applications, whether the location is a river, tidal water, lake, or other area with dynamic and numerous environmental factors.

BoardSafe's design, engineering, and quality manufacturing make them a preferred product for long-term value and durability. Since 1989, we have specialized in high-end construction. Many marinas, rowing centers, and other commercial locations, seek our experience and attention to detail for their projects.

BoardSafe has become the trusted aluminum dock provider when quality and expertise are the priority. We define quality as skilled craftsmen, high-quality materials, and a vast understanding of site variables, ecology, and engineering considerations. Our dedication is evident in all our products, and we are proud to be made in the USA.

For more information about this project and other projects, our capabilities, and other information, visit us at boardsafedocks.com.


Devonshire Park-1

New Dock System Solves Riverside Park Dock Flooding Worries

BoardSafe Docks was contracted to come up with a design for a new floating dock system on the Schuylkill River across from Pottstown, PA, in North Coventry Township. The site included an existing boat ramp and signs of a previous dock system that was washed away in a flood years ago.

The customer asked if we could design a new dock system that would hold up during flooding conditions. It had to be ADA-compliant and not project too far into the river.

Our solution was to install a foundation that supported a cantilevered deck that projected out over the river. A concrete foundation was excavated, and forms were installed, then poured. The cantilevered steel deck was then bolted to the foundation and decking was installed. The gangway was then connected to the side of the deck running parallel to the river bank. Supplemental flotation was placed at the bottom of the gangway to provide adequate buoyancy for its weight and to maintain a freeboard of 16 inches, the same as the floating dock. The gangway was connected to the floating dock via a piano hinge. The use of the hinge means there is no step from the gangway to the dock, allowing the dock system to move up and down as the water levels fluctuate. The floating dock was made of two 8’ x 20’ dock sections connected together with a piano hinge. A rubber dock bumper and adjustable cleats were installed on the docks.

[smartslider3 slider="7"]

Dimensions

Foundation 8’ x 10’ x 4’ with rebar cage and drive steel pilings
Cantilevered deck 8’ x 20’ steel construction, steel railing, and composite decking
Gangway 5’ x 54’ with an expanded section at the top
Floating dock 8’ x 40’, manufactured in two sections

The project was completed on July 14, 2022.

https://youtu.be/Lft3diU6AaE