ADA-Accessible Kayak Launch for Shawnee, OK, Kayak Club

BoardSafe supplied the Pott County Kayak Club of Shawnee, Oklahoma, with an ADA-accessible kayak launch at Shawnee Twin Lakes. BoardSafe worked alongside the kayak club and a local contractor to have the kayak launch installed in late April, 2021. The 12ft x 20ft launch featured a 20ft-long access gangway direct-feed kayak chute to improve accessibility for adaptive paddlers. Our team at BoardSafe is thrilled to have assisted the Pott County Kayak Club and local community with supplying the adaptive kayak launch as one of their initial projects to build an ADA-compliant community park on the shores of Shawnee Twin Lakes.


Boston's New Floating Restaurant Uses BoardSafe Gangways

Boston Harbor is probably best-known for the Boston Tea Party. Since then, many restaurants have opened along the harbor, but BoardSafe is proud to be part of a new venture — a restaurant floating in the harbor.

Charlie Larner is outfitting the 245-foot tall ship, Caledonia, to seat 300 people on its main deck. The fare will be typical sea fare, including mostly raw fish, lobster rolls, and fresh bivalves. Cocktails will be poured at a massive bar covered by awnings made from sails.

BoardSafe is engineering and installing the gangway that will provide safe, stable access for the crowds of diners. Because Sailor's Oyster Bar will be afloat in harbor waters that are prone to large fluctuations, tidal ebbs and flows from 9 – 12 feet had to be taken into consideration during the design process. BoardSafe's decades of made-in-the-USA experience and commitment to using only the highest-grade aluminum suit such a project perfectly. We take into consideration site variables, ecology, and other considerations.

In this case, an existing, unused set of railroad tracks sparked the idea for the perfect way to manage gangway movement for the safety of the customers. The gangway can travel and pivot safely to facilitate access to this unique restaurant, displaying BoardSafe’s ability to “go with the flow.”

The new floating restaurant will be surrounded by luxury yachts and be a part of a renewed harbor venue. The BoardSafe gangway will fit right in, giving safe, reliable access to this new venture.


[metaslider id="6596"]

Here are some photos of the installation in progress.


[metaslider id="6685"]

Here are some new photos of this unique installation!


[metaslider id="6898"]


BoardSafe Custom Pier and Docks on the Schuylkill River

This recent BoardSafe custom installation includes an aluminum staircase leading down the bank, measuring 3½ feet wide by 18 feet long. It also includes a fixed aluminum pier, as well as floating aluminum docks.


Custom BoardSafe Aluminum Floating Dock, Boat Rack, and Launches

BoardSafe recently engineered, manufactured, and installed, a custom aluminum floating dock and gangway for a private lake. The BoardSafe custom aluminum floating dock is equipped with two kayak launches. The installation also includes an attached boat rack that cantilevers out over the water, freeing up valuable deck space.

Watch this video testimonial and bird's-eye perspective of this custom BoardSafe installation:




City of Coeur d'Alene Atlas Waterfront Project

The City of Coeur d'Alene has officially purchased nearly 47 acres of Spokane River waterfront property that was the former Atlas Mill site for the inclusion of a BoardSafe adaptive kayak launch and Clip-A-Launch. The city purchased the property for $7,850,000 and the sale was recorded on May 16, 2018, making the sale official. The city began the process of purchasing the Atlas Waterfront property in May of 2017. The city purchased the property to create permanent public waterfront access and encourage economic development initiatives on the site.

The featured photo is of the BoardSafe Kayak Launch being installed in Coeur D’Alene, Idaho, at Atlas Mill Waterfront Park. This system not only includes our standard launch system, but a Clip-A-Launch as well. This was BoardSafe's first project in Idaho.

The City of Coeur d'Alene is working in partnership with ignite CDA to assess all opportunities related to uses of this property and to engage the community.  The City Council and ignite CDA board members have directed staff to move forward with creating a new urban renewal district, which is being referred to as the Atlas District, and to expand the River and Lake districts.  A Site Analysis, Financial Feasibility Study, and Master Planning effort is underway to develop an urban renewal plan for the project.  That effort is being led by Welch-Comer Engineers with sub-consultants Heartland and GGLO.  City staff, ignite CDA, and elected officials have been working together to provide feedback on the analysis and to provide ample opportunities for community outreach and public involvement.  Special thanks to CDA2030 and other community volunteers for making the community engagement efforts to date a success.

Here we will provide basic project information, project status updates, and when and how stakeholders and community members can get involved in sharing their thoughts on this important project.

News & Information


Conshohoken-rowing-center

Rowing Center Aluminum Floating Dock Survives Flood

The Conshohocken Rowing Center, located north of Philadelphia on the Schuylkill River, was challenged by a rainstorm that caused the river to rise 20 feet, reaching the top of the embankment. Despite the flooding, the aluminum floating docks, gangways, and rowing center, remained intact. This is yet another testimony to BoardSafe's engineering and construction skills. Watch this on-the-spot video:


BoardSafe Gangway Will Connect People with Floating Dock in Scituate, MA

Located 20 miles southwest of Boston, the historic town of Scituate on Cape Cod Bay is one of the most picturesque harbors in New England. Scituate Harbor Marina has one of the most convenient locations in Scituate Harbor. They are the closest public marina in the harbor to ocean access. They are the only marina that can accommodate vessels up to 80 feet LOA. They have ample vehicle parking with secure access to our docks.

BoardSafe designed, built, and installed a 5' x 80’ gangway for the marina. This gangway connects the land with a floating dock.


[metaslider id="6912"]


BoardSafe Provides Docks and Gangways for Philly's Boathouse Row

In May of 2020, Philadelphia city officials announced that the Schuylkill River would be dredged for the first time in over twenty years. Now, a team that includes a Penn Design professor is researching strategies to keep the river clear for decades to come.

BoardSafe entered into a contract with six of the boathouses on Boathouse Row in Philadelphia. The contracts range from removing the docks and storing them prior to dredging to putting some of them back and installing new floating docks and gangways. They are working with the following boathouses: PA Barge Club, Fairmount, University, U Penn, Crescent, and Malta.


Texas Rowing Center Austin Gets New BoardSafe Docks and Storage

Take a look at these photos from the installation of BoardSafe docks at the Texas Rowing Center in Austin, Texas. The Center is a rowing, kayaking, and stand-up paddleboard (SUP) concession located in downtown Austin on the north shore of the Lady Bird Lake hike and bike trail, directly across from Austin High School.

Here is a recent video showing what a world-class rowing center looks like:

The main dock is 50’ x 300’ (15,000 square feet). We’ve also engineered and manufactured two 3,000-square-foot buildings that will be located directly on the dock. The building will house the racing sculls and equipment. We manufactured custom aluminum racking systems as well.

This is a major part of the ongoing improvement of the Texas Rowing Center. BoardSafe is building cages for storing the increasingly-popular standup paddleboards that are the favorite marine recreation for residents and tourists alike.

NEW: BoardSafe also provides boat storage solutions! Read about our paddleboard cages and kayak racks here.

Here are some photos of the actual on-site construction and the finished project: